top of page

Location:
Damascus, PA
Scope of Work:
We recently completed a concrete pour for a local garage. The owner requested a 25x40 pad adjacent to the existing garage. Our team prepared the site, regraded the parking lot, and constructed a drainage ditch on the left side of the building to prevent water runoff across the parking area. This ensures long-term durability and proper drainage for the new pad and surrounding area.
Project Gallery








bottom of page